Pre-Commissioning Testing

Proper installation and operation of the equipment, within the specifications of the ANSI Z358.1 standard and the requirements of this section, shall be demonstrated prior to project closeout and facility occupation. Tags to allow periodic testing records to be kept shall be affixed to the showers and eyewash fountains. A commissioning checklist such as that included in Appendix C should be used to document proper equipment installation and operation.

 

Prudent Practices in the Laboratory, Section 6.F.2.6

ANSI Z358.1 5.5.1

8 CCR 5162 (e)